Rehabilitation of McIlraith Bridge will close west multi-use pathway for three weeks

George McIIraaith Bridge Photo by City of Ottawa

As of Monday, July 18, the multi-use pathway at George McIlraith Bridge (spanning the Rideau River between Smyth Road and Main Street) will be closed for three weeks as a safety precaution while the bridge bearings are replaced overhead.

The pathway is located at the west abutment of the bridge, between Rideau Garden Drive and the roundabout on Rideau River Drive. Cyclists and pedestrians will be detoured via the intersection of Riverdale Avenue and Main Street.

For more information about the construction activity happening across the city, or for information about traffic and travel planning, visit ottawa.ca.

For more information on City programs and services, visit ottawa.ca or call 3-1-1 (TTY: 613-580-9656). You can also connect with us through Facebook, Twitter and Instagram.

facebooktwitterby feather
Filed in: Front Page

You might like:

The Perils of Potholes The Perils of Potholes
Please share your memorable experiences, encounters with Paul Dewar Please share your memorable experiences, encounters with Paul Dewar
OOE Artist Features: Yvonne Coutts, Choreographer OOE Artist Features: Yvonne Coutts, Choreographer
Hosers wash out opposition to ice the Capital Ward Cup Hosers wash out opposition to ice the Capital Ward Cup

Leave a Reply

Submit Comment
© 7650 Mainstreeter. All rights reserved. XHTML / CSS Valid.
Proudly designed by Theme Junkie.